Dindas Distribution Building

Case studies index
Commercial timber warehouse and distribution centres.  Prefabricated for easy on-site construction Timber portal frame structural drawings

Location:Tingalpa, Queensland

Size:3, 250 square metres

This purpose-built warehouse and distribution centre was simply assembled and erected using riggers and cranage contractors. Timberbuilt’s simple assembly means ease of construction allowed for 90% of assembly on the ground, improving safety on site.

On-site assembly is simplified, so conventional rigger-contractors can be used. This controls cost and eliminates delays.

This distribution centre in Tingalpa boasts impressive 42 m open spans, and was erected quickly and efficiently. Portal frames are manufactured from LVL and plywood in box sections, producing light yet very high strength rafters and columns.

I-beam purlins also provide strong yet lightweight solutions, and simple connections ensure rapid construction without the need for highly skilled trades.

The ability to assemble the roof “cassettes” on the ground, then simply lift into place slotting into the column gussets significantly reduced OH & S risk during construction.

For more detail, see attached article.

Download PDF article
Source: Australian Timber Design, September 1997